
ITEAC successfully executed a large-scale telecommunications infrastructure project at Saudi Global Ports, ensuring robust and reliable connectivity across the port.
Key Deliverables:
-
Procurement and installation of 48,300M of outdoor fiber optic cables and 12,400M of indoor cabling
-
Setup of 19” racks, patch panels, grounding systems, and terminations
-
End-to-end testing, documentation, and as-built drawings
The project provided SGP with a fully integrated, tested, and documented telecom network, enabling seamless port operations and laying the foundation for advanced communication systems.