Aramco – EIOR Project Deployment

As part of the EIOR Project, ITEAC contributed to the deployment of safe, efficient, and effective field treatments. The scope involved supporting the pre-treatment workflow, including well insulation from grounded structures, disconnection of pumps, and implementation of site security measures.

ITEAC collaborated closely with Aramco to facilitate the availability of key support facilities such as portacabins, stable power supplies (diesel generators), cabling, and labor services.

Following site inspections and hardware deployment, ITEAC was involved in operational preparations and supported controlled electrical treatments carried out over a 24–36-hour period, managing peak power requirements of up to 400kW. After treatment, equipment was safely removed, and the site was returned to its original condition.

ITEAC’s participation in the project reflects its capability in delivering technical expertise, operational support, and commitment to excellence in field operations.